chore(deps): update dependency @swc/helpers to v0.5.23 #239

Merged
julien merged 1 commits from renovate/swc into main 2026-05-27 17:34:48 +02:00
Collaborator

This PR contains the following updates:

Package Type Update Change
@swc/helpers (source) devDependencies patch 0.5.21 -> 0.5.23

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [@swc/helpers](https://swc.rs) ([source](https://github.com/swc-project/swc/tree/HEAD/packages/helpers)) | devDependencies | patch | [`0.5.21` -> `0.5.23`](https://renovatebot.com/diffs/npm/@swc%2fhelpers/0.5.21/0.5.23) | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0MC42Mi4xIiwidXBkYXRlZEluVmVyIjoiNDAuNjIuMSIsInRhcmdldEJyYW5jaCI6Im1haW4iLCJsYWJlbHMiOlsiZGVwZW5kZW5jaWVzIl19-->
adastra-bot added 1 commit 2026-05-27 09:38:35 +02:00
chore(deps): update dependency @swc/helpers to v0.5.23
CI / commits (pull_request) Has been skipped
CI / perf (pull_request) Has been skipped
CI / scan (pull_request) Failing after 3m48s
CI / a11y (pull_request) Successful in 7m54s
CI / check (pull_request) Successful in 10m18s
Docs site / build (pull_request) Successful in 6m40s
71459aa5dc
adastra-bot scheduled this pull request to auto merge when all checks succeed 2026-05-27 09:38:39 +02:00
julien merged commit a848e0fabd into main 2026-05-27 17:34:48 +02:00
julien deleted branch renovate/swc 2026-05-27 17:34:49 +02:00
Sign in to join this conversation.
No Reviewers
No Label
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: julien/apf_portal#239