c78dccbae1
The full CI pipeline (check, scan, commits, perf, a11y) was sized for human PRs. On Renovate's dep-bump PRs: - `perf` (Lighthouse build + 3-iteration median across the critical-routes list) costs 3-5 min per PR for a signal that is essentially zero on a patch/minor dep bump — the SPA today serves the static placeholder, and even with real routes the score on most bumps stays inside the median noise floor. - `commits` re-validates messages that Renovate generates from a Conventional-Commits-conformant template. Tautological. Skip both jobs when the PR author is the dedicated `apf-portal-bot` Gitea user. The `push` event on `main` still runs the full pipeline, so any regression a Renovate PR sneaks through is caught seconds after merge — fast enough to revert without disruption. ADR-0017 is amended to document the policy: the table of "where Lighthouse CI runs" now distinguishes human PR / bot PR / push to main; a new "Pre-merge gating policy" subsection records the rationale and the human-takeover edge case. The §Confirmation checklist is updated. The docs/development.md "Reviewing Renovate PRs" subsection is updated so contributors expect a leaner pipeline on bot PRs.