chore(ci): skip perf and commits gates on Renovate-authored PRs (#23)
## Summary Renovate's dep-bump PRs run the full pipeline today (`check`, `scan`, `commits`, `perf`, `a11y`). Two of those gates have near-zero signal on a typical bump and dominate the wall-clock cost: - **`perf`** — Lighthouse build + 3-iteration median across the critical-routes list. 3-5 min per PR for a metric that is essentially zero on a patch/minor dep bump (the SPA today serves the static placeholder; even with real routes a typical bump stays inside the median noise floor). - **`commits`** — re-validates commit messages that Renovate generates from a Conventional-Commits-conformant template. Tautological. Skip both when the PR author is the `apf-portal-bot` Gitea user. The `push` event on `main` still runs the full pipeline post-merge, so any regression caught by `perf` is detected seconds after merge — fast enough to revert. Net result: Renovate PRs run `check + scan + a11y` only, ≈ 4-5 min faster per PR. ## ADR amendment ADR-0017 is amended in the same change: - "Where Lighthouse CI runs" table now distinguishes human PR / bot PR / push to main / scheduled / local. - New "Pre-merge gating policy: human PRs vs bot PRs" subsection records the rationale and the human-takeover edge case. - §Confirmation entry for `perf` is reworded to reflect the conditional gate. ## Test plan - [ ] After merge, the next Renovate-triggered PR (auto-rebase or new bump) shows only `check`, `scan`, `a11y` queued — no `perf`, no `commits`. - [ ] A human-opened PR (e.g. this one) still queues all 5 gates. - [ ] On `push` to `main` post-merge, the full pipeline runs including `perf`. --------- Co-authored-by: Julien Gautier <julien.gautier@apf.asso.fr> Reviewed-on: #23
This commit was merged in pull request #23.
This commit is contained in:
+2
-1
@@ -244,7 +244,8 @@ Repo → Actions → "Renovate" workflow → Run workflow. Useful when you've ju
|
||||
|
||||
### Reviewing Renovate PRs
|
||||
|
||||
- Each Renovate PR is gated by the same CI as a human PR — `check`, `scan`, `commits`, `perf`, `a11y`. Don't merge until all are green.
|
||||
- Renovate PRs run a leaner CI pipeline than human PRs — `check`, `scan`, `a11y` only. The `perf` and `commits` gates are skipped (per [ADR-0017](decisions/0017-performance-budgets-lighthouse-ci.md) — Lighthouse signal on a dep bump is essentially zero, commitlint on bot-generated messages is tautological). The full `perf` gate still runs on `push` to `main` post-merge, so regressions are caught seconds after merge rather than before.
|
||||
- Don't merge until the remaining gates are green.
|
||||
- The "Renovate Dependency Dashboard" issue (auto-created on first run) lists every pending update grouped by status. Use it to triage which PRs to expedite.
|
||||
- For a major bump that introduces breaking changes, **don't reflexively merge**: read the changelog, then either accept the work or close the PR with a "rejected" label. Renovate respects that label and won't keep re-opening the same major.
|
||||
- **Adding or removing** a dependency belongs in a feature PR, not in Renovate's scope. Renovate only updates _versions_ of existing deps.
|
||||
|
||||
Reference in New Issue
Block a user